Waterproof four-eye hood COB LED PAR light stage lighting 2 in 1

 Voltage / frequencyAC100V-240V/50-60HzRated power400WLight source4 ultra-high brightness COB 100W  LEDLamp lifeabout 50,000 hoursColorwhite and warm white 2 in 1 Color temperature3200K - 5600K can be adjustedControl channel4/8 channelsLight exit angle35°Dimming0-100% linear electronic dimmingStrobeIndependent

Featured Products

 

Voltage / frequencyAC100V-240V/50-60Hz
Rated power400W
Light source4 ultra-high brightness COB 100W  LED
Lamp lifeabout 50,000 hours
Colorwhite and warm white 2 in 1 
Color temperature3200K - 5600K can be adjusted
Control channel4/8 channels
Light exit angle35°
Dimming0-100% linear electronic dimming
StrobeIndependent high-speed electronic strobe, 1-13 times per second
Operating modevoice control, self-propelled, master-slave, DMX512
Color rendering indexRa ≥ 85


Waterproof Four-Eyes Blinder COB LED PAR Lights Stage Lighting 2in1



Waterproof Four-Eyes Blinder COB LED PAR Lights Stage Lighting 2in1Waterproof Four-Eyes Blinder COB LED PAR Lights Stage Lighting 2in1
Waterproof Four-Eyes Blinder COB LED PAR Lights Stage Lighting 2in1

Waterproof Four-Eyes Blinder COB LED PAR Lights Stage Lighting 2in1





Warranty:
a) We have One year warranty for our products.
b) For damage on arrival, please claim to the shipping company firstly and get the claim number and inform us,also take the photos on the damage and send to us for verifying, we will help you to claim to the shipping company to get the compensation.
c) If there is the problem with the product, firstly you need send the pictures or the video to us, let us make surewhat's problem about the product. If the problem can use the parts to solve,
we will offer you the replacement for free during warranty time.

FAQ:
Q:Are you a factory or trade company?
A:We are a professional stage lighting factory.
Q:Do you accept OEM or ODM?
A:We accept OEM but not for ODM now.
Q:What's the delivery time?
A:Usually,it costs about 3 to 7 days for sample and more time for bulk order.Eg,as for a 20 cabniet,we need about 20 days to prepare well.
Q:What's the payment term?
A:We accept T/T,western union and paypal.
Q:Are the products of good quality?How can you ensure it?
A:Yes,the quality is good.We have strict test before shipping.We have test for semi-manufactured products about 3 days and 2 days for end products.
Company Information:
Guangzhou Ao Mei Di Stage Lighting Equipment Company was built in 2006.It is a professional enterprise of high new technology in producing stage lighting equipment. Its workshop covers an
area of 6000squaremeters and total area over 9000squaremeters.

Your satisfication is our goal.
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours